Water and Wastewater Engineering: Design Principles and Practice, Second Edition [2 ed.] 9781260132274

3,394 1,068 19MB

English Pages 1467 Year 2020

Report DMCA / Copyright

DOWNLOAD FILE

Water and Wastewater Engineering: Design Principles and Practice, Second Edition [2 ed.]
 9781260132274

Table of contents :
5-0. CHAPTER PRELIMINARIES......Page 218
5-1. INTRODUCTION......Page 219
5-2-2. Capacity......Page 220
5-3-2. Storage......Page 221
5-4-1. Dry Chemical Feed Systems......Page 226
5-4-2. Liquid Feed Systems......Page 228
5-4-3. Gas Feed System......Page 229
5-5. CHEMICAL COMPATIBILITY......Page 231
5-6. MATERIALS COMPATIBILITY......Page 232
5-7. DESIGNING FOR SAFETY AND HAZARDOUS CONDITIONS......Page 237
5-8-1. Hints from the Field......Page 245
5-9. CHAPTER REVIEW......Page 247
5-10. PROBLEMS......Page 248
5-11. DISCUSSION QUESTIONS......Page 250
5-12. REFERENCES......Page 251
6-0. CHAPTER PRELIMINARIES......Page 252
6-1. INTRODUCTION......Page 253
6-2-1. Electrical Properties......Page 254
6-3-1. Coagulants......Page 258
6-3-2. Physics of Coagulation......Page 259
6-3-3. Chemistry of Coagulation......Page 261
6-3-4. pH and Dose......Page 267
6-4-2. Coagulant Selection......Page 274
6-4-4. Flocculant Aids......Page 275
6-5-4. Chemical Sequence......Page 276
6-6-1. Velocity Gradient......Page 277
6-6-3. Selection of G and Gt Values......Page 278
6-7-1. Flash Mixing Design Criteria......Page 280
6-7-2. Flocculation Mixing Design Criteria......Page 291
6-8-1. Hints from the Field......Page 304
6-9. CHAPTER REVIEW......Page 305
6-10. PROBLEMS......Page 306
6-11. DISCUSSION QUESTIONS......Page 313
6-12. REFERENCES......Page 314
7-0. CHAPTER PRELIMINARIES......Page 316
7-1. HARDNESS......Page 317
7-2-2. Lime-Soda Softening Chemistry......Page 323
7-3. SOFTENING PROCESSES......Page 330
7-3-6. Split Treatment......Page 331
7-3-7. Recarbonation......Page 332
7-4-1. Estimating CO2 Concentration......Page 334
7-4-2. Selective Calcium Removal......Page 336
7-4-3. Softening to Practical Limits......Page 339
7-4-4. Split Treatment......Page 341
7-4-6. Use of Caustic Soda......Page 345
7-5-2. Iron and Manganese......Page 346
7-5-5. Other Contaminants......Page 347
7-6-1. Conventional Softening Basins......Page 349
7-6-2. Upflow Solids Contact Basins......Page 350
7-7. OPERATION AND MAINTENANCE......Page 354
7-8-1. The Langelier Saturation Index (LSI)......Page 355
7-8-2. Stabilization Design for Lime-Soda Softened Water......Page 357
7-9. CHAPTER REVIEW......Page 361
7-10. PROBLEMS......Page 362
7-11. DISCUSSION QUESTIONS......Page 370
7-12. REFERENCES......Page 371
8-0. CHAPTER PRELIMINARIES......Page 372
8-1. INTRODUCTION......Page 373
8-2-1. Ion Exchange Resins and Reactions......Page 374
8-2-2. Ion Exchange Kinetics......Page 375
8-2-3. Properties of Ion Exchange Resins......Page 376
8-3-1. Cocurrent Operation......Page 383
8-3-3. Bypass......Page 384
8-3-4. Multiple Columns......Page 385
8-4. ION EXCHANGE PRACTICE......Page 386
8-4-1. Resin Selection......Page 387
8-4-2. Flow Rates......Page 388
8-4-4. Estimation of Resin Volume......Page 389
8-4-7. Cycle Time......Page 392
8-4-8. Vessel Design......Page 393
8-4-10. Brine Disposal......Page 397
8-5. OPERATION AND MAINTENANCE......Page 398
8-6. CHAPTER REVIEW......Page 399
8-7. PROBLEMS......Page 400
8-8. DISCUSSION QUESTION......Page 405
8-9. REFERENCES......Page 406
9-0. CHAPTER PRELIMINARIES......Page 407
9-1-1. Delineation of Membrane Processes......Page 408
9-2-2. Osmotic Pressure......Page 410
9-2-3. Flux......Page 411
9-3-2. Membrane Configuration......Page 414
9-3-4. Service Life......Page 415
9-4-1. Process Description......Page 417
9-4-4. Concentrate Stream......Page 418
9-4-5. Process Design......Page 419
9-4-6. Operation and Maintenance......Page 425
9-5. ELECTRODIALYSIS......Page 426
9-6. CHAPTER REVIEW......Page 427
9-7. PROBLEMS......Page 428
9-8. DISCUSSION QUESTION......Page 430
9-9. REFERENCES......Page 431
10-0. CHAPTER PRELIMINARIES......Page 432
10-1. INTRODUCTION......Page 433
10-2-1. Type I Sedimentation......Page 434
10-2-2. Type II Sedimentation......Page 444
10-2-3. Type III and Type IV Sedimentation......Page 447
10-2-4. Non-Ideal Behavior of Settling Tanks......Page 451
10-3-1. Alternatives......Page 453
10-4-1. Rectangular Sedimentation Basins......Page 457
10-4-2. Horizontal-Flow Rectangular Sedimentation Basin Design Criteria......Page 460
10-4-3. Design Criteria for Small- to Medium-Sized Plants......Page 464
10-4-4. High-Rate Settler Modules......Page 466
10-4-5. High-Rate Settler Module Design Criteria......Page 467
10-5-1. Hints from the Field......Page 472
10-6. CHAPTER REVIEW......Page 473
10-7. PROBLEMS......Page 474
10-8. DISCUSSION QUESTIONS......Page 478
10-9. REFERENCES......Page 479
11-0. CHAPTER PRELIMINARIES......Page 480
11-1. INTRODUCTION......Page 481
11-2. AN OVERVIEW OF THE FILTRATION PROCESS......Page 482
11-2-1. Nomenclature......Page 483
11-3-1. Grain Size......Page 485
11-3-2. Physical Properties......Page 486
11-4-1. Mechanisms of Filtration......Page 490
11-5-1. Clean Filter Headloss......Page 494
11-5-2. Backwashing Hydraulics......Page 497
11-6-1. Filter Type......Page 503
11-6-3. Filtration Rate......Page 504
11-6-4. Media......Page 508
11-6-5. Filter Support and Underdrains......Page 509
11-6-6. Backwashing......Page 511
11-6-7. Wash Troughs......Page 512
11-6-8. Gullet......Page 515
11-6-9. Flow Apportionment and Rate Control......Page 517
11-6-10. Headloss Accommodation......Page 518
11-6-11. Some Important Appurtenances......Page 521
11-6-12. Design Criteria......Page 522
11-7-1. Hints from the Field......Page 530
11-8. CHAPTER REVIEW......Page 532
11-9. PROBLEMS......Page 533
11-10. DISCUSSION QUESTIONS......Page 542
11-11. REFERENCES......Page 543
12-0. CHAPTER PRELIMINARIES......Page 545
12-1. INTRODUCTION......Page 546
12-2-2. Models of Membrane Filtration......Page 548
12-2-3. Theory of Membrane Filter Hydraulics......Page 549
12-3-2. Membrane Configuration......Page 554
12-3-3. Temperature and Pressure Effects......Page 556
12-3-4. Service Life......Page 558
12-4-1. Process Description......Page 559
12-4-4. Process Design......Page 560
12-4-5. Design Criteria......Page 563
12-4-6. Operation and Maintenance......Page 564
12-5. CHAPTER REVIEW......Page 566
12-6. PROBLEMS......Page 567
12-7. DISCUSSION QUESTIONS......Page 569
12-8. REFERENCES......Page 570
13-0. CHAPTER PRELIMINARIES......Page 571
13-1. INTRODUCTION......Page 572
13-2-1. Disinfection Chemistry......Page 573
13-2-2. Chemical Disinfectant Kinetics......Page 580
13-2-3. Chemical Oxidant Demand......Page 583
13-2-4. Mechanisms of Disinfection......Page 584
13-2-5. Disinfection Kinetics......Page 585
13-2-6. Disinfection Practice......Page 590
13-3-3. What Causes Corrosion?......Page 602
13-3-6. Corrosive Indices......Page 603
13-3-8. Shewhart Control Charts......Page 604
13-3-9. Providing Advice to Customers......Page 606
13-4. CONTACT FACILITIES......Page 607
13-4-1. Disinfection Design......Page 613
13-5. EMERGENCY DISINFECTION......Page 619
13-6-2. Fluoridation Chemistry......Page 620
13-6-3. Fluoridation Practice......Page 621
13-7. OPERATION AND MAINTENANCE......Page 625
13-8. CHAPTER REVIEW......Page 626
13-9. PROBLEMS......Page 627
13-10. DISCUSSION QUESTIONS......Page 635
13-11. REFERENCES......Page 636
14-0. CHAPTER PRELIMINARIES......Page 640
14-1. INTRODUCTION......Page 641
14-2-1. Treatment Strategies......Page 642
14-3-1. Stripping......Page 650
14-4. FLUORIDE......Page 651
14-5-1. Treatment Strategies......Page 654
14-6. NITRATE......Page 658
14-7-1. Treatment Strategies......Page 659
14-8. PERCHLORATE......Page 661
14-9. PHARMACEUTICALS AND ENDOCRINE-DISRUPTING CHEMICALS (EDCs)......Page 663
14-10. RADIONUCLIDES......Page 664
14-11-1. Treatment Strategies......Page 665
14-12-1. Treatment Strategies......Page 679
14-13. CHAPTER REVIEW......Page 682
14-14. PROBLEMS......Page 683
14-15. DISCUSSION QUESTIONS......Page 687
14-16. REFERENCES......Page 688
15-0. CHAPTER PRELIMINARIES......Page 692
15-1. INTRODUCTION......Page 693
15-2-1. Volume-Mass Relationships......Page 696
15-2-2. Volume Reduction Relationships......Page 697
15-3-2. Coagulation Sedimentation Basin......Page 700
15-3-3. Softening Sedimentation Basin......Page 701
15-3-6. Membrane Process Residuals......Page 702
15-3-7. Ion Exchange Residuals......Page 703
15-3-8. Mass Balance Analysis......Page 704
15-4-3. Spent Backwash Water......Page 706
15-4-4. Recycling......Page 707
15-5-2. Iron Coagulant Recovery......Page 708
15-5-3. Lime and Magnesium Recovery......Page 709
15-6. RESIDUALS CONVEYANCE......Page 710
15-7. MANAGEMENT OF SLUDGES......Page 711
15-7-1. Thickening......Page 712
15-7-2. Dewatering......Page 719
15-7-3. Nonmechanical Dewatering......Page 720
15-7-4. Mechanical Dewatering......Page 732
15-8. MANAGEMENT OF LIQUID RESIDUALS......Page 741
15-9-1. Arsenic Residuals......Page 743
15-9-4. Nitrate Residuals......Page 744
15-9-6. Radioactive Residuals......Page 745
15-9-7. Synthetic Organic Chemical (SOC) Residuals......Page 746
15-10-4. Landfilling......Page 747
15-11. CHAPTER REVIEW......Page 749
15-12. PROBLEMS......Page 750
15-13. DISCUSSION QUESTIONS......Page 757
15-14. REFERENCES......Page 758
16-0. CHAPTER PRELIMINARIES......Page 760
16-1. INTRODUCTION......Page 761
16-2-2. Evaluation of Process Options......Page 762
16-2-4. Case Study 16-1......Page 771
16-2-5. Case Study 16-2......Page 773
16-2-6. Case Study 16-3......Page 775
16-3-1. Plant Layout......Page 778
16-3-2. Plant Hydraulics......Page 780
16-3-3. Supervisory Control and Data Acquisition (SCADA)......Page 785
16-4-3. Vulnerability Assessment......Page 792
16-4-4. Layered Security......Page 793
16-5. CHAPTER REVIEW......Page 796
16-6. PROBLEMS......Page 797
16-7. DISCUSSION QUESTIONS......Page 806
16-8. REFERENCES......Page 807
17-0. CHAPTER PRELIMINARIES......Page 809
17-1. INTRODUCTION......Page 810
17-2-1. Fire Flow Requirements......Page 811
17-2-3. Maximum Day......Page 817
17-2-4. Determining the Design Flow......Page 818
17-3-2. Hints from the Field......Page 819
17-4-1. Pipe Material Selection......Page 820
17-4-2. Economic Considerations......Page 821
17-4-4. Design Equations......Page 822
17-4-5. Simple Network Evaluation......Page 824
17-4-6. Valve Selection......Page 826
17-4-8. Minor Losses......Page 829
17-5-1. Tank Terminology......Page 832
17-5-2. Location......Page 833
17-5-4. Volume......Page 834
17-5-5. Appurtenances......Page 837
17-5-6. Water Quality......Page 838
17-5-7. Hints from the Field......Page 840
17-6-1. Type of Pump......Page 842
17-6-2. Parallel and Series Operation......Page 844
17-6-4. Typical Operating Procedure......Page 845
17-6-5. Economic and Energy Considerations......Page 846
17-7-2. Skeletonization......Page 849
17-8-2. Sanitary Protection of Water Mains......Page 851
17-9. CHAPTER REVIEW......Page 853
17-10. PROBLEMS......Page 854
17-11. DISCUSSION QUESTIONS......Page 862
17-12. REFERENCES......Page 863
18-0. CHAPTER PRELIMINARIES......Page 865
18-1-3. Domestic Wastewater Flows......Page 866
18-1-5. Infiltration and Inflow......Page 867
18-1-8. Variation of Domestic Wastewater Flows......Page 868
18-1-10. Variation of Infiltration Flows......Page 869
18-1-11. Energy and Economic Considerations......Page 870
18-2-1. Characteristics of Domestic Wastewater......Page 872
18-2-2. Characteristics of Industrial Wastewater......Page 875
18-3. WASTEWATER TREATMENT STANDARDS......Page 878
18-3-1. Total Maximum Daily Load......Page 879
18-3-2. Pretreatment of Industrial Wastes......Page 880
18-4. SLUDGE DISPOSAL REGULATIONS......Page 882
18-4-2. Pathogen Reduction Alternatives......Page 884
18-4-3. Vector Attraction Reduction......Page 888
18-5-3. Plant Layout......Page 890
18-6. PLANT LOCATION......Page 891
18-7. CHAPTER REVIEW......Page 892
18-8. PROBLEMS......Page 893
18-9. DISCUSSION QUESTIONS......Page 898
18-10. REFERENCES......Page 899
19-0. CHAPTER PRELIMINARIES......Page 900
19-1-1. Nomenclature......Page 901
19-1-2. Appurtenances......Page 903
19-2-2. Surveying and Mapping......Page 908
19-3-2. Pipe Material Selection......Page 909
19-3-3. Design Criteria......Page 911
19-3-4. Design Equations......Page 915
19-3-6. Design of a Main......Page 920
19-3-7. Final Drawings......Page 927
19-4-1. System Descriptions......Page 928
19-4-2. General Design Considerations......Page 929
19-5-1. Force Main Design......Page 931
19-5-2. Pump Selection......Page 932
19-5-3. Conventional Pump Station Design......Page 933
19-5-4. Factory-Assembled Pump Stations......Page 937
19-6-1. Hints from the Field......Page 940
19-7. ECONOMIC AND ENERGY CONSIDERATIONS......Page 942
19-8. SEWER SAFETY......Page 944
19-9. CHAPTER REVIEW......Page 947
19-10. PROBLEMS......Page 948
19-11. DISCUSSION QUESTIONS......Page 953
19-12. REFERENCES......Page 954
20-0. CHAPTER PRELIMINARIES......Page 956
20-1. INTRODUCTION......Page 957
20-2-1. Design Considerations......Page 958
20-2-2. Economic and Energy Considerations: Process Pumping......Page 961
20-3-1. Parshall Flume......Page 962
20-3-2. Magnetic Flow Meter......Page 965
20-3-3. Location......Page 966
20-4-1. Bar Rack Cleaning Mechanisms......Page 967
20-4-2. Bar Rack Design Practice......Page 969
20-4-3. Fine Screen Options......Page 977
20-4-4. Fine Screen Design Practice......Page 979
20-5-2. Macerators......Page 981
20-5-4. Design Considerations......Page 982
20-6-1. Theory......Page 983
20-6-2. Grit Removal Alternatives......Page 985
20-6-3. Aerated Grit Chamber Design Practice......Page 987
20-6-4. Vortex Grit Chamber Design Practice......Page 995
20-7-2. Theory......Page 996
20-7-3. Equalization Design Practice......Page 997
20-8. ALTERNATIVE PRELIMINARY PROCESS ARRANGEMENTS......Page 1006
20-9. CHAPTER REVIEW......Page 1007
20-10. PROBLEMS......Page 1008
20-11. DISCUSSION QUESTIONS......Page 1012
20-12. REFERENCES......Page 1013
21-0. CHAPTER PRELIMINARIES......Page 1015
21-1. INTRODUCTION......Page 1016
21-2-1. Nonideal Behavior......Page 1017
21-3-3. Circular Tanks......Page 1019
21-3-4. Rectangular Tanks......Page 1020
21-4-1. General......Page 1022
21-4-2. Circular Sedimentation Basin Design......Page 1026
21-4-3. Rectangular Tanks......Page 1035
21-4-4. Primary Sedimentation Tank Design Criteria......Page 1038
21-4-5. Operation and Maintenance......Page 1039
21-5-1. Enhanced Sedimentation......Page 1041
21-5-3. Fine Screens......Page 1042
21-6. CHAPTER REVIEW......Page 1043
21-7. PROBLEMS......Page 1044
21-8. REFERENCES......Page 1047
22-0. CHAPTER PRELIMINARIES......Page 1049
22-1. INTRODUCTION......Page 1050
22-2. ROLE OF MICROORGANISMS......Page 1051
22-3-4. Some Microbes of Interest in Wastewater Treatment......Page 1052
22-4-1. Energy Capture......Page 1054
22-4-2. Metabolism......Page 1056
22-4-3. End Products......Page 1059
22-4-4. Requirements for Microbial Growth......Page 1060
22-5-1. Pure Culture Growth Characteristics......Page 1062
22-5-2. Mixed Culture Growth Characteristics......Page 1063
22-5-3. The Monod Equation......Page 1064
22-6-2. Anoxic Decomposition......Page 1067
22-6-3. Anaerobic Decomposition......Page 1068
22-7-1. Aerobic Oxidation......Page 1069
22-7-2. Nitrification......Page 1070
22-7-3. Denitrification......Page 1072
22-7-4. Phosphorus Removal......Page 1074
22-7-5. Selector......Page 1076
22-8-3. Foaming......Page 1077
22-9. CHAPTER REVIEW......Page 1079
22-10. PROBLEMS......Page 1080
22-11. DISCUSSION QUESTIONS......Page 1082
22-12. REFERENCES......Page 1083
23-0. CHAPTER PRELIMINARIES......Page 1085
23-1. INTRODUCTION......Page 1086
23-2-1. Oxidation Ponds......Page 1087
23-2-2. Activated Sludge......Page 1088
23-3. PROCESSES FOR DENITRIFICATION......Page 1093
23-4. PROCESSES FOR PHOSPHORUS REMOVAL......Page 1095
23-5-1. Process Description......Page 1097
23-6-2. Oxidation Ponds......Page 1099
23-6-3. Completely Mixed Reactor Model......Page 1100
23-6-4. Batch Reactor......Page 1105
23-6-5. Plug Flow with Recycle Model......Page 1106
23-6-6. Safety Factor......Page 1107
23-6-7. Evaluation of Assumptions......Page 1108
23-6-8. Sludge Return......Page 1110
23-6-9. Sludge Production......Page 1113
23-6-10. Oxygen Demand......Page 1115
23-6-11. Oxygen Transfer......Page 1118
23-6-12. Economic and Energy Considerations in Aeration System Design......Page 1122
23-6-13. Food-to-Microorganism Ratio (F/M)......Page 1124
23-6-14. Specific Denitrification Rate......Page 1125
23-6-15. Sludge Volume Index......Page 1127
23-6-16. Volumetric Loading......Page 1128
23-7. SUSPENDED GROWTH DESIGN PRACTICE......Page 1129
23-7-1. Facultative Oxidation Ponds......Page 1131
23-7-2. Oxidation Ditch......Page 1138
23-7-3. Sequencing Batch Reactor......Page 1152
23-7-4. A2/O™......Page 1164
23-7-5. Energy and Economic Considerations......Page 1174
23-8-3. Equalization......Page 1185
23-8-6. Solids Retention Time (SRT)......Page 1186
23-8-12. Design Criteria......Page 1187
23-8-13. Fouling......Page 1188
23-9. CHAPTER REVIEW......Page 1190
23-10. PROBLEMS......Page 1191
23-11. DISCUSSION QUESTIONS......Page 1202
23-12. REFERENCES......Page 1205
24-0. CHAPTER PRELIMINARIES......Page 1209
24-1. INTRODUCTION......Page 1210
24-2-1. Trickling Filters......Page 1211
24-2-2. Biofilters......Page 1213
24-3. ATTACHED GROWTH DESIGN PRINCIPLES......Page 1214
24-4. ATTACHED GROWTH DESIGN PRACTICE......Page 1216
24-5-1. Rotating Biological Contactors (RBCs)......Page 1223
24-5-3. Moving Bed Biofilm Reactor (MBBR)......Page 1224
24-6. CHAPTER REVIEW......Page 1226
24-7. PROBLEMS......Page 1227
24-8. REFERENCES......Page 1229
25-0. CHAPTER PRELIMINARIES......Page 1230
25-1. INTRODUCTION......Page 1231
25-2-1. Design Principles......Page 1232
25-2-2. Secondary Settling Design Practice......Page 1240
25-3-2. Dechlorination......Page 1246
25-3-4. Chlorination and Dechlorination Design......Page 1248
25-3-5. Ultraviolet Disinfection......Page 1249
25-4. POSTAERATION......Page 1252
25-5. CHAPTER REVIEW......Page 1254
25-6. PROBLEMS......Page 1255
25-7. DISCUSSION QUESTIONS......Page 1257
25-8. REFERENCES......Page 1258
26-0. CHAPTER PRELIMINARIES......Page 1260
26-1. INTRODUCTION......Page 1261
26-2-1. Theory......Page 1262
26-2-2. Design Strategies......Page 1263
26-3-3. Design Practice......Page 1265
26-4-3. Pretreatment......Page 1272
26-4-5. Fouling and Cleaning......Page 1273
26-5-4. Carbon Selection......Page 1274
26-5-6. Carbon Regeneration......Page 1275
26-5-7. Design Criteria......Page 1276
26-6-1. Processes for Advanced Oxidation......Page 1277
26-6-3. Overcoming Process Limitations......Page 1278
26-7. CHAPTER REVIEW......Page 1279
26-8. PROBLEMS......Page 1281
26-9. REFERENCES......Page 1282
27-0. CHAPTER PRELIMINARIES......Page 1283
27-1. SLUDGE HANDLING ALTERNATIVES......Page 1284
27-2-1. Screenings......Page 1286
27-2-4. Secondary Sludge......Page 1287
27-2-6. Liquid Residuals......Page 1288
27-3-2. Mass Balance......Page 1289
27-4-1. Pump Selection......Page 1297
27-4-2. Headloss Determination......Page 1299
27-4-3. Sludge Piping......Page 1301
27-4-4. Hints from the Field......Page 1302
27-5-2. Management of Grit......Page 1304
27-6-2. Thickening......Page 1305
27-7-1. Theory......Page 1310
27-7-4. Alkaline Stabilization Design Practice......Page 1311
27-8-2. Theory......Page 1315
27-8-3. Aerobic Digestion Design Practice......Page 1316
27-9-1. Process Description......Page 1322
27-9-3. Stoichiometry......Page 1323
27-9-4. Growth Kinetics......Page 1326
27-9-6. Anaerobic Digester Design Principles......Page 1327
27-9-7. Anaerobic Digester Design Practice......Page 1331
27-9-8. Operational Considerations......Page 1340
27-10-2. Heat Treatment......Page 1343
27-11-2. Centrifugation......Page 1344
27-11-3. Continuous Belt-Filter Presses......Page 1345
27-11-6. Comparison of Mechanical Dewatering......Page 1348
27-11-8. Liquid Streams......Page 1349
27-12-3. Utilization......Page 1350
27-13-3. Application Methods......Page 1351
27-14. CHAPTER REVIEW......Page 1353
27-15. PROBLEMS......Page 1354
27-16. REFERENCES......Page 1360
28-0. CHAPTER PRELIMINARIES......Page 1362
28-1. INTRODUCTION......Page 1363
28-2-1. Evaluation of Process Options......Page 1364
28-2-2. Initial Screening......Page 1368
28-2-4. Process Selection Examples......Page 1383
Case Study 28-1......Page 1384
Case Study 28-2......Page 1385
Case Study 28-3......Page 1387
28-3. SIMULATION MODELING......Page 1390
28-4-2. Plant Hydraulics......Page 1391
28-4-3. Mass Balances......Page 1395
28-4-4. Special Considerations for MBR Plants......Page 1397
28-4-6. Security......Page 1398
28-5. CHAPTER REVIEW......Page 1399
28-6. PROBLEMS......Page 1400
28-7. REFERENCES......Page 1402
29-0. CHAPTER PRELIMINARIES......Page 1403
29-1-1. Examples of Indirect Potable Reuse......Page 1404
29-1-2. Examples of Direct Potable Reuse......Page 1405
29-2. WATER QUALITY STANDARDS......Page 1407
29-3-2. Redundancy......Page 1409
29-3-4. Resilience......Page 1410
29-4-3. Lessons Learned......Page 1411
29-5-1. Case Study: Surface Water Augmentation......Page 1415
29-5-2. Case Study: Groundwater Augmentation......Page 1416
29-6-1. Case Study: Coping with Seasonal Demand and Droughts......Page 1419
29-6-2. Case Study: Moving from IPR to DPR to Cope with Long-Term Drought......Page 1420
29-6-3. Case Study: DPR from Reservoirs......Page 1422
29-7. CHAPTER REVIEW......Page 1423
29-8. REFERENCES......Page 1424
A.0. CHAPTER PRELIMINARIES......Page 1426
A-1. SOURCES......Page 1439
B. APPENDIX B: U.S. STANDARD SIEVE SIZES......Page 1441
C. APPENDIX C: PIPE, FITTING, AND VALVE DATA......Page 1442
D. APPENDIX D: .US. ENVIRONMENTAL PROTECTION AGENCY Ct VALUES FOR DISINFECTANTS......Page 1454

Polecaj historie